Banking on Climate Chaos Case Study: EMBA Hunutlu Coal Plant

Rainforest Action Network – Mar 24, 2021

EMBA Hunutlu is a 1,320-megawatt coal power plant under construction in southern Turkey. The plant is located in the country’s Iskenderun Bay area, which is already suffering from air pollution caused by industrial facilities including a gas power plant, two coal power plants, and a steel factory. https://www.ran.org/the-understory/ca…​ This was originally published as a case study in “Banking on Climate Chaos: Fossil Fuel Finance Report 2021” — a report by Rainforest Action Network, BankTrack, Indigenous Environmental Network, Oil Change International, Reclaim Finance, and Sierra Club. You can see the full report at bankingonclimatechaos.org

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s